2025 Lifeline Outreach Grant Project Reports must be completed in the PSC Grants System.
Full project reporting requires the submission of 3 reports over the 1-year grant performance period (2 Interim Project Status Reports and 1 Final Project Summary Report).
Interim Project Status Reports – each consists of 2 documents:
- 2025 Lifeline Outreach Interim Status Report Event Log - 2025 LLG Events Excel file to be downloaded in advance, completed as a separate file, and uploaded to the PSC Grants System in Question 1 of each Interim Status Report.
- 2025 Lifeline Outreach Interim Status Report - Report Sample for View Only. The reports can only be filled out in the PSC Grants System.
-
Reporting Schedule
Interim Status Reports are due biannually, resulting in 2 reporting periods. Each Interim Project Status Report covers activities from the preceding 6 months:
-
S1 – Due January 15, 2026 (7/1/25 – 12/31/25)
-
S2 – Due July 15, 2026 (1/1/26 – 6/30/26)
Any approved performance period extension will require additional Status Reports.
Final Project Summary Report – consists of a single document summarizing the project.
NOTE: Questions in this report are different from the Interim Status Report.
-
Reporting Schedule
- One report at the end of the performance period (covers all activities from 07/01/2025 – 06/30/2026)
- Due: July 31, 2026