Grant County Solar Project | 9804-CE-100

Project Summary
  • Overview: Grant County Solar, LLC is proposing a 200 megawatt photovoltaic (PV) solar electric generation facility. The project would be located on approximately 2,058 acres (3.21 square miles) of primarily agricultural land, in the town of Potosi, Grant County, in which approximately 1,403 acres (2.19 square miles) would be developed to host the proposed solar facilities. The major components of the project would include PV panels, power conversion units (which include an inverter and transformer), approximately 32 miles of 34.5 kilovolt (kV) underground collector circuits, a collector substation, and a new approximately 200-foot 138 kV generation transmission tie-line. The solar arrays and substation would be fenced, and the applicant has provided some alternative solar array sites for evaluation and use if needed. The project would be located approximately 3 miles north of the villages of Potosi and Tennyson.

  • Applicant stated need: This project is proposed by an independent power producer, Grant County Solar, LLC, a wholly owned subsidiary of NextEra Energy, Inc. As such, the need for the project is not reviewed by the Commission. Grant County Solar has stated that they intend to either; directly or indirectly through its affiliates, construct and operate the project by selling the power using one or more long term power purchase agreements. Grant County Solar would reserve the right to sell or assign the Project, or a portion thereof, to another qualified entity at any time before, during or after the project is constructed.

  • Estimated cost: This project is proposed by an independent power producer, and the Commission does not review the project cost or need. The cost to Wisconsin utilities, and ratepayers, would be reviewed when the power from the facility is purchased by Wisconsin utilities.

  • Project Location: The Town of Potosi in Grant County, Wisconsin (see map).

  • Proposed schedule:
    • The application was submitted to the Commission on May 7, 2020.

    • The Commission is reviewing the project, with no firm schedule as to a decision date at this time. The environmental analysis will occur over the next several months and a Commission decision may occur in the autumn of 2020.

    • If approved, the proposed construction schedule for this project is to begin in October, 2021. The project is proposed to be completed and in service by December 1, 2023.
Key Project Documents

As documents become available, hyperlinks will be added. Additionally, you can view all documents filed in this docket on Commission's Case Management System (CMS) page under dockets 9804-CE-100

Opportunities for Public Participation

Opportunities for public involvement will be posted here as they become available.

For more information on becoming involved in the Commission review of construction cases, please visit our public participation page, or call one of the Project contacts listed below.

 
Statutory Review
  • The solar electric generation facility is a Type 3 action under Wis. Admin. Code § PSC 4.10(3).Type III actions normally do not require preparation of an EA or an environmental impact statement (EIS) under Wis. Admin. Code § PSC 4.10(3). However, an evaluation of a specific Type III proposal may indicate that the preparation of an EA is warranted for that proposal. The Commission will prepare an EA for this project that will evaluate the location of the project and its potential environmental, community, and private property impacts. There will be a preliminary determination when the EA is complete that will determine whether the preparation of an EIS is necessary. Comments on this preliminary determination will be accepted and considered before a final determination is made. At the time of the preliminary determination, the Commission shall make copies of the EA available to those persons that request it.