< Highlighted Cases
Final Decision Issued
On October 22, 2026, the Commission issued a final decision for this project. At the time of final decision, construction was expected to begin following the final decision with completion by July 2029.
Quarterly construction updates and post decision correspondence between the Commission and the Applicant can be found in the corresponding docket reports.
Docket Reports: 6680-CG-171
Towns of Beloit and Rock, Rock County, Wisconsin
Docket ID: 6680-CG-171
Application of Wisconsin Power and Light Company, as a Gas Public Utility, for a Certificate of Authority to Construct a Liquefied Natural Gas Facility, in the Towns of Rock and Beloit, Rock County, Wisconsin.
View and Download Project Map
Jump to Section:
Interactive Map
Use the interactive map to explore the project.
Tips for using the map
- Click the tiles in the upper left hand corner to Zoom in, Zoom out, return to the Default map view, or use the Find my location function.
- Click the tiles in the upper right hand corner to Search and Find address or place, toggle on/off Layers, choose a different Basemap, or Measure distance and area.
View Map in New Window
Application Summary
Overview
Wisconsin Power and Light Company (WPL) is seeking approval to construct a new Liquefied Natural Gas (LNG) facility including two billion cubic feet (BCF) of storage and associated systems to pretreat, liquefy, store, and vaporize LNG in the Towns of Beloit and Rock, Rock County, Wisconsin. The major components of the proposed project include feed gas pretreatment and liquefaction systems as well as LNG storage and sendout systems. WPL is seeking a Certificate of Authority (CA) and all other approvals required to construct the LNG storage plant and other necessary related facilities.
Applicant stated need
The proposed project is needed to address WPL’s firm natural gas capacity deficit for future firm demand and additional load including from WP&L’s Riverside generation units while improving system resiliency through local control of a portion of WPL’s natural gas supply.
Estimated cost
The construction cost of the proposed project is currently estimated at $517 million with a requested $520 million of Allowance for Funds Used During Construction (AFUDC).
Project location
The applicant proposes to construct this project on 100 acres of land in the Towns of Beloit and Rock, Rock County, Wisconsin.
Proposed schedule
- The applicant submitted the application to the Commission in February 2025.
- If approved, the applicant anticipates construction of this project to begin in February 2026 with an estimated completion date of May 2028.
The proposed project is categorized as a
Type II action under
Wis. Admin. Code § PSC 4.10(2). The Commission prepared an Environmental Assessment (EA) for this project that evaluated the location of the project and its potential environmental, community, and private property impacts. The Environmental Assessment found that the construction of this project is unlikely to have a significant impact on the human environment. Therefore, the preparation of an EIS is not required.
Key Application Documents
Access Docket 6680-CG-171 in the PSC Case Management System to view additional information.
Utilize the
Staff Involved tab for contact details for PSC staff assigned to the docket, including the case coordinator and the environmental review coordinator.
Click the
Documents tab for a complete list of docket documents categorized by document type.
Access Docket 6680-CG-171