Oak Creek LNG Project

​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​< Highlighted Cases
Image of Wisconsin map and highlighted county

​City of Oak Creek, Milwaukee County, Wisconsin


Docket ID: 6630-CG​-140

Application of Wisconsin Electric Power Company for a Certificate of Authority under Wis. Stat. § 196.49 and Wis. Admin. Code
§ PSC 133.03 to Construct a New Liquefied Natural Gas Facility and Associated Natural Gas Pipelines in Oak Creek, Wisconsin.

View and Download Proj​ect Map​​

Jump to Section:


Interactive Map

Use the interactive map to explore the​​ project.

Tips for using the map

  • Click the tiles in the upper left hand corner to Zoom in, Zoom out, return to the Default map view, or use the Find my location function.
  • Click the tiles in the upper right hand corner to Search and Find address or place, toggle on/off Layers, choose a different Basemap, or Measure distance and area.

​​

​​


​​​View Map i​n Ne​w Window

Application Summary

Overview

Wisconsin Electric Power Company - Gas Operations (WE-GO) is seeking approval to construct a new Liquefied Natural Gas (LNG) facility including two billion cubic feet (BCF) of storage and associated systems to pretreat, liquefy, store, and vaporize LNG in Oak Creek, Milwaukee County, Wisconsin. The major components of the proposed project include feed gas pretreatment and liquefaction systems as well as LNG storage and sendout systems. WE-GO is seeking a Certificate of Authority (CA) and all other approvals required to construct the LNG storage plant​ and other necessary related facilities.​​

Applicant stated need

The proposed project is to ensure that the applicant can continue to serve its customers reliably and efficiently, especially during periods of peak demand, in light of the constraints on obtaining additional firm capacity from the existing i​nterstate pipeline system.

Estimated cost

The construction cost of the proposed project is currently estimated at $456.3 million with a requested $64.6 million of Allowance for Funds Used During Construction (AFUDC).

Project location

The applicant proposes to construct this project on 22 acres of land in the City of Oak Creek, Milwaukee County, Wisconsin.

Proposed schedule

  • The applicant submitted the application to the Commission in April 2024. 
  • The applicant anticipates construction of this project to begin in June 2025 with an estimated completion date of Winter 2027-2028.​
Statutory Review​

This LNG storage facility is a Type II​ action under Wis. Admin. Code § PSC 4.10(2)​. ​The Commission will prepare an Environmental Assessment (EA) for this project that will evaluate the location of the project and its potential environmental, community, and private property impacts. There will be a preliminary determination when the EA is complete that will determine whether the preparation of an Environmental Impact Statement is necessary. Comments on this preliminary determination will be accepted and considered before a final determination is made. At the time of the preliminary determination, the Commission shall make copies of the EA available to those persons that request it.​


Key Applicatio​n Documents


Case Contacts and Additional Information

Access Docket 6630-CG-140 in the PSC Case Management System to view​ additional information.

Utilize the Staff Involved tab for contact details for PSC staff assigned to the docket, including the case coordinator and the environmental review coordinator.

Click the Documents tab for a complete list of docket documents categorized by document type.​

Access Doc​ket 6630-CG-​140​​​​​​​​ ​ ​​​
​ ​

​Opportunities for Public Participation

The Commission offers several opportunities for public participation in its proceedings. For construction projects, these opportunities may include providing input regarding the scope of environmental impact documents, attending public hearings sessions, and signing up for emails for updates related to a particular case.


​​< Highlighted Cases