Vista Sands Solar Project

​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​< Highlighted Cases
Image of Wisconsin map and highlighted county

Village of Plover and Towns of Plover, Buena Vista, and Grant, Portage County, Wisconsin

Docket ID: 9820-CE-100

Application for a Certificate of Public Convenience and Necessity of Vista Sands Solar LLC to Construct the Vista Sands Solar Farm Electric Generation Facility in the Village of Plover and Towns of Plover, Buena Vista, and Grant, Portage County, Wisconsin.

View and Download Proj​ect Map​​

Jump to Section:


Interactive Map

Use the interactive map to explore the​​ project.

Tips for using the map

  • Click the tiles in the upper left hand corner to Zoom in, Zoom out, return to the Default map view, or use the Find my location function.
  • Click the tiles in the upper right hand corner to Search and Find address or place, toggle on/off Layers, choose a different Basemap, or Measure distance and area.

​​​View Map i​n Ne​w Window

Application Summary

Overview

Vista Sands Solar LLC (Vista Sands or the applicant), an affiliate of Doral Renewables LLC, is seeking approval to construct a solar energy generating facility with a generating capacity of 1,315.6 MWAC (megawatt alternating current) plus a 300 MW battery energy storage system (BESS) in the Village of Plover and the towns of Grant, Plover, and Buena Vista in Portage County. The entire project study area that was evaluated is approximately 9,854 acres and the total proposed project area (including solar arrays and associated facilities) would be approximately 7,109.8 acres. The proposed project PV panel area (excluding associated facilities) would be 5,011.7 acres. The applicant also provided 1,590.6 acres of alternative PV panel areas. The BESS and operation and maintenance building would require approximately 5.1 acres. The major components of the proposed project include PV panels, power conversion units, inverters, approximately 318 miles of collector corridors for collector circuits and medium voltage lines, one substation, and a 345 kV overhead gen-tie transmission line of approximately 1,600 feet in length connecting the primary project substation to the point of interconnection. Vista Sands is seeking a Certificate of Public Convenience and Necessity (CPCN) and all other approvals required to construct the 1,310.4 MWAC project, collector circuits and medium voltage collector lines, BESS, gen-tie line, and other necessary related facilities.

​*This information has been updated based on the revised project design submitted to the electronic record filing (ERF) system by the applicant on June 7, 2024. ​

Applicant stated need

This project is proposed by an independent power producer. Therefore, the need for the project is not reviewed by the Commission.

Estimated cost

This project is proposed by an independent power producer. Therefore, the Commission does not review the project cost. The cost to Wisconsin utilities, and ratepayers, would be reviewed if the facility or power from the facility is purchased by Wisconsin utilities.​

Project location

The applicant proposes to construct this project on 6,737 acres of land in the Village of Plover and Towns of Plover, Buena Vista, and Grant, Portage County, Wisconsin​.

Proposed schedule

  • The applicant submitted the application to the Commission in January 2024. 
  • If approved, t​he applicant anticipates construction for this project to begin in March 2025 with an estimated​ completion date of December 2028.​
Statutory Review​

The solar electric generation facility is a Type III​ action under Wis. Admin. Code § PSC 4.10(3). The battery energy storage system (BESS) is a Type II​ action under Wis. Admin. Code § PSC 4.10(2)​. ​The Commission will prepare an Environmental Assessment (EA) for this project that will evaluate the location of the project and its potential environmental, community, and private property impacts. There will be a preliminary determination when the EA is complete that will determine whether the preparation of an Environmental Impact Statement is necessary. Comments on this preliminary determination will be accepted and considered before a final determination is made. At the time of the preliminary determination, the Commission shall make copies of the EA available to those persons that request it.


Key Application Documents


Case Contacts and Additional Information

Access Docket 9820​-CE-100 in the PSC Case Management System to view​ additional information.

Utilize the Staff Involved tab for contact details for PSC staff assigned to the docket, including the case coordinator and the environmental review coordinator.

Click the Documents tab for a complete list of docket documents categorized by document type.​

Access Doc​ket 9820​​-CE-​​100​​​​​​​​

Opportunities for Public Participation

The Commission offers several opportunities for public participation in its proceedings. Click the links below to stay updated on these opportunities, which may include providing input regarding the scope of environmental impact documents, attending public hearings, offering comments, or signing up for email notifications related to a particular case.​


​​​​ ​