Port Washington Water Main Project

​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​< Highlighted Cases
Image of Wisconsin map and highlighted county

​The City of Port Washington, Ozaukee County, Wisconsin​

Docket ID: 4780-CW-105​​

Application of the City of Port Washington, as a Water Public Utility, for Authority to Construct 4.2 Miles of 16-inch Water Main to Serve the Vantage Data Center Site, in the City of Port Washington, Knellsville (Unincorporated), and the Town of Port Washington, Ozaukee County, Wisconsin.​​​​

View and Download Proj​ect Map​​

Jump to Section:


Interactive Map

Use the interactive map to explore the​​ project.

Tips for using the map

  • Click the tiles in the upper left hand corner to Zoom in, Zoom out, return to the Default map view, or use the Find my location function.
  • Click the tiles in the upper right hand corner to Search and Find address or place, toggle on/off Layers, choose a different Basemap, or Measure distance and area.​​

​ ​​ ​​ ​​ ​​
​​

​​​View M​ap i​n Ne​w Window

Application Summary

Over​view

The City of Port Washington (applicant) is seeking approval for the construction of an approximately 4.2-mile, 16-inch diameter water main (pipeline) expansion to serve the Vantage Data Center (Vantage) site.

Applicant Stated Need

The project is needed to provide a redundant point of water supply to Vantage’s private water system, with a daily demand of 22,000 gallons per day and target fire flow of 3,500 gallons per minute for a 3-hour duration to the point of connection.

Estimated Cost

The applicant stated that the estimated project cost is $11,400,000.

Project Location

The project would connect to existing water main in the City of Port Washington and the new water main would be installed heading north through Knellsville (unincorporated) and the Town of Port Washington, in Ozaukee County, Wisconsin.​

Proposed Schedule

  • The applicant submitted the application to the Commission in July 2026.
  • If approved, the applicant anticipates construction for this project to begin on January 4, 2027 with an estimated completion date of October 29, 2027​.

​​The proposed project​ is categorized as a Type II action under Wis. Admin. Code § PSC 4.10(2). The Commission will prepare an Environmental Assessment (EA) for this project that will evaluate the location of the project and its potential environmental, community, and private property impacts. There will be a preliminary determination when the EA is complete that will determine whether the preparation of an Environmental Impact Statement (EIS) is necessary.
​ ​ ​ ​

Key Application Documents


Case Contacts and Additional Information

Access Docket 4780​-CW-105 in the PSC Case Management System to view​ additional information.

Utilize the Staff Involved tab for contact details fo​r PSC staff assigned to the docket, including the case coordinator and the environmental review coordinator.

Click the Documents tab for a complete list of docket documents categorized by document type.​

Access Doc​ket​ 4780​​-CW-​​105​​​​​​​​ ​

Opportunities​ for Public Participation

The Commission offers several opportunities for public participation in its proceedings. Click the links below to stay updated on these opportunities, which may include providing input regarding the scope of environmental impact documents, attending public hearings, offering comments, or signing up for email notifications related to a particular case.​

​ ​
< Highlighted Cases