Rock County LNG Project

​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​< Highlighted Cases
Image of Wisconsin map and highlighted county

​​​Towns of Beloit and Rock, Rock County, Wisconsin​

Docket ID: 6680-CG​-171

Application of Wisconsin Power and Light Company, as a Gas Public Utility, for a Certificate of Authority to Construct a Liquefied Natural Gas Facility, in the Towns of Rock and Beloit, Rock County, Wisconsin.

View and Download Proj​ect Map​​

Jump to Section:


Interactive Map

Use the interactive map to explore the​​ project.

Tips for using the map

  • Click the tiles in the upper left hand corner to Zoom in, Zoom out, return to the Default map view, or use the Find my location function.
  • Click the tiles in the upper right hand corner to Search and Find address or place, toggle on/off Layers, choose a different Basemap, or Measure distance and area.


​​​View Map i​n Ne​w Window


Application Summary

Overview

Wisconsin Power and Light Company (WPL) is seeking approval to construct a new Liquefied Natural Gas (LNG) facility including two billion cubic feet (BCF) of storage and associated systems to pretreat, liquefy, store, and vaporize LNG in the Towns of Beloit and Rock, Rock County, Wisconsin. The major components of the proposed project include feed gas pretreatment and liquefaction systems as well as LNG storage and sendout systems. WPL​ is seeking a Certificate of Authority (CA) and all other approvals required to construct the LNG storage plant​ and other necessary related facilities.​​

Applicant stated need

The proposed project is needed to address WPL’s firm natural gas capacity deficit for future firm demand and additional load including from WP&L’s Riverside generation units while improving system resiliency through local control of a portion of WPL’s natural gas supply.

Estimated cost

The construction cost of the proposed project is currently estimated at $517 million with a requested $520 million of Allowance for Funds Used During Construction (AFUDC).

Project location

The applicant proposes to construct this project on 100 acres of land in the Towns of Beloit and Rock, Rock​ County, Wisconsin.

Proposed schedule

  • The applicant submitted the application to the Commission in February 2025​. 
  • If approved, t​he applicant anticipates construction of this project to begin in February 2026 with an estimated completion date of May 2028.​
Statutory Review​

This LNG storage facility is a Type II​ action under Wis. Admin. Code § PSC 4.10(2)​. ​The Commission will prepare an Environmental Assessment (EA) for this project that will evaluate the location of the project and its potential environmental, community, and private property impacts. There will be a preliminary determination when the EA is complete that will determine whether the preparation of an Environmental Impact Statement is necessary. Comments on this preliminary determination will be accepted and considered before a final determination is made. At the time of the preliminary determination, the Commission shall make copies of the EA available to those persons that request it.​


Key Applicatio​n Documents


Case Contacts and Additional Information

Access Docket 6680-CG-171 in the PSC Case Management System to view​ additional information.

Utilize the Staff Involved tab for contact details for PSC staff assigned to the docket, including the case coordinator and the environmental review coordinator.

Click the Documents tab for a complete list of docket documents categorized by document type.​

Access Doc​ket 6680-CG-​171​​​​​​​​ ​ ​​​
​ ​

​Opportunities for Public Participation

The Commission offers several opportunities for public participation in its proceedings. Click the links below to stay updated on these opportunities, which may include providing input regarding the scope of environmental impact documents, attending public hearings, offering comments, or signing up for email notifications related to a particular case.​


​​< Highlighted Cases​​