Riverside Enhancement Project

​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​< Highlighted Cases
Image of Wisconsin map and highlighted county

Town of Beloit, Rock County, Wisconsin

Docket ID: 6680-CE-187​

Application of Wisconsin Power and Light Company for a Certificate of Authority to Construct an Enhancement Project at Riverside Energy Center.​​

View and Download Proj​ect ​Map​​

Jump to Section:

​​

Interactive Map

Use the interactive map to explore the ​project.

Tips for using the map

  • Enter a location or address in Find address or place to zoom into specific location.
  • Click the information button () under the search bar to view additional guidance and tips for using this mapping application.​
    ​​

View Map i​n Ne​w W​indow

Application Summary

Overview

Wisconsin Power and Light Company (WPL) is proposing construction of a new electric generation facility with a total nameplate capacity of 17.5 MW. Major components of the project include seven Reciprocating Internal Combustion Engine (RICE)​ units, which would all be fueled with natural gas. The facilities would also include accessory structures for water preparation and storage, fuel storage and handling, electrical interconnection, and other support functions. Water for nitrogen oxide control and closed cooling would be provided by the existing plant well water supply system. WPL has provided a proposed site layout and an alternative site layout for the Commission’s consideration.

Applicant stated need

The proposed project would provide additional reliability and resiliency to the electrical transmission system​​.​

Estimated cost

The construction cost of the proposed project is currently estimated at $52.78 million without Allowance for Funds Used During Construction (AFUDC).

Project location

The proposed project would be located on up to 3.5 acres of property currently owned by WPL in the Town of Beloit, in Rock County.

Proposed schedule

  • The application was submitted to the Commission in March of 2024. 
  • If approved, the applicant anticipates construction for this project to begin in May of 2025. The project is proposed to be completed and in service by February of 2027.
Statutory Review​

This electric generation facility is a Type II​ action under Wis. Admin. Code § PSC 4.10(2)​. ​The Commission will prepare an Environmental Assessment (EA) for this project that will evaluate the location of the project and its potential environmental, community, and private property impacts. There will be a preliminary determination when the EA is complete that will determine whether the preparation of an Environmental Impact Statement is necessary. Comments on this preliminary determination will be accepted and considered before a final determination is made. At the time of the preliminary determination, the Commission shall make copies of the EA available to those persons that request it.


Key Application Documents


Case Contacts and Additional Information

Access Docket 6680-CE-187 in the PSC Case Management System to view additional information.

Utilize the Staff Involved tab for contact details for PSC staff assigned to the docket, including the case coordinator and the environmental review coordinator.

Click the Documents tab for a complete list of docket documents categorized by document type.​

Access Docket 6680-CE-187

Opportunities for Public Participation

The Commission offers several opportunities for public participation in its proceedings. Click the links below to stay updated on these opportunities, which may include providing input regarding the scope of environmental impact documents, attending public hearings, offering comments, or signing up for email notifications related to a particular case.​


​​< Highlighted Cases