City of Oak Creek, Milwaukee​​​​ County, Wisconsin

Docket ID: 6630-CE-317

Application of Wisconsin Electric Power Company (WEPCO​)​ for a Certificate of Public Convenience and Necessity to Construct and Operate the South Oak Creek CT Project, Consisting of Five Natural Gas-Fired Single-Cycle Combustion Turbines Generating up to 1100 MW total at the South Oak Creek Facility in the City of Oak Creek, Milwaukee County, Wisconsin.​​

View and Download Proj​ect ​Map

Jump to Section:

​​

Interactive Map

Use the interactive map to explore the ​project.

Tips for using the map

  • Click the tiles in the upper left hand corner to Zoom in, Zoom out, return to the Default map view, or use the Find my location function.
  • Click the tiles in the upper right hand corner to Search and Find address or place, toggle on/off Layers, choose a different Basemap, or Measure distance and area.​​

​​​​

View Map i​n Ne​w Window

Application Summary

Overview

Wisconsin Electric Power Company (WEPCO) is proposing construction of a new electric generation facility with a total nameplate capacity of 1,100 Megawatts. Major components of the project include five combustion turbine (CT) generation units, which would all be fueled with natural gas. The project facilities would also include accessory structures for water preparation and storage, fuel storage and handling, electrical interconnection, and other support functions. The CT units would be interconnected to the existing onsite interconnection point currently utilized by Oak Creek Units 5 and 6, which would be retired in conjunction with the proposed project. Water for nitrogen oxide control and closed cooling would be provided by the existing plant well water supply system. WEPCO has provided a proposed site layout and an alternative site layout for the Commission’s consideration.

Applicant stated need

The proposed project is needed to provide additional capacity and energy resources to meet energy demand​ obligations in the 2026 timeframe.​

Estimated cost

The construction cost of the proposed project is currently estimated at $1.205 billion without Allowance for Funds Used During Construction (AFUDC). Capital expenditures with AFUDC is estimated to be $1.343 billion.

Project location

The proposed project would be located on up to approximately 19 acres of property currently owned by WEPCO in the City of Oak Creek, Milwaukee County.

Proposed schedule

  • The application was submitted to the Commission in April of 2024
  • If approved, the applicant anticipates construction for this project to begin​ ​in​ May of 2026. The project is proposed to be completed and in service by Winter 2027 - Summer 2028.
Statutory Review

This electric generation facility is a Type II​ action under Wis. Admin. Code § PSC 4.10(2)​. ​The Commission will prepare an Environmental Assessment (EA) for this project that will evaluate the location of the project and its potential environmental, community, and private property impacts. There will be a preliminary determination when the EA is complete that will determine whether the preparation of an Environmental Impact Statement is necessary. Comments on this preliminary determination will be accepted and considered before a final determination is made. At the time of the preliminary determination, the Commission shall make copies of the EA available to those persons that request it.


Key Application Documents


Case Contacts and Additional Information

Access Docket 6630-CE-317​ in the PSC Case Management System to view additional information.

Utilize the Staff Involved tab for contact details for PSC staff assigned to the docket, including the case coordinator and the environmental review coordinator.

Click the Documents tab for a complete list of docket documents categorized by document type.​

Access Docket 6630-CE-317

Opportunities for Public Participation

The Commission offers several opportunities for public participation in its proceedings. Click the links below to stay updated on these opportunities, which may include providing input regarding the scope of environmental impact documents, attending public hearings, offering comments, or signing up for email notifications related to a particular case.​


​​< Highlighted Cases