Campbell Water System Project

​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​​< Highlighted Cases
Image of Wisconsin map and highlighted county

​The Town of Campbell, La Crosse County, Wisconsin​

Docket ID: 935-CW-102

Application of the Town of Campbell, as a Water Public Utility, for Authority to Construct a New Water System, in the Town of Campbell, La Crosse County, Wisconsin.

View and Download Proj​ect Map​​

Jump to Section:


Interactive Map

Use the interactive map to explore the​​ project.

Tips for using the map

  • Click the tiles in the upper left hand corner to Zoom in, Zoom out, return to the Default map view, or use the Find my location function.
  • Click the tiles in the upper right hand corner to Search and Find address or place, toggle on/off Layers, choose a different Basemap, or Measure distance and area.​​

​ ​​ ​​ ​​
​​

​​​View M​ap i​n Ne​w Window

Application Summary

Over​view

The Town of Campbell is seeking approval for the construction of a new water system including: two (2) or three (3) final wells, a distribution system, elevated storage tank, pumphouse/water treatment facilities, and well site sewer upgrades for the Campell Water System.​

Applicant Stated Need

The project is needed to provide safe drinking water for town residents. The majority of town residents currently source drinking water from private wells. Wisconsin DNR issued a town-wide water advisory advising residents that the groundwater is not fit for human consumption due to potential human health risks. This project would provide a safer alternative water supply.

Estimated Cost

The applicant stated that the estimated project cost is $64,775,500.

Project Location

The project would be located in the Town of Campbell in La Crosse County, Wisconsin.

Proposed Schedule

  • The applicant submitted the application to the Commission in October 2025. 
  • If approved, the applicant anticipates construction for this project to begin in January 6, 2025 with an estimated completion date of October 15, 2028​.

​​The proposed project​ is categorized as a Type II action under Wis. Admin. Code § PSC 4.10(2). The Commission will prepare an Environmental Assessment (EA) for this project that will evaluate the location of the project and its potential environmental, community, and private property impacts. There will be a preliminary determination when the EA is complete that will determine whether the preparation of an Environmental Impact Statement (EIS) is necessary.
​ ​ ​

Key Application Documents


Case Contacts and Additional Information

Access Docket 935​-CW-102 in the PSC Case Management System to view​ additional information.

Utilize the Staff Involved tab for contact details fo​r PSC staff assigned to the docket, including the case coordinator and the environmental review coordinator.

Click the Documents tab for a complete list of docket documents categorized by document type.​

Access Doc​ket​ 935​​-CW-​​102​​​​​​​​ ​

Opportunities​ for Public Participation

The Commission offers several opportunities for public participation in its proceedings. Click the links below to stay updated on these opportunities, which may include providing input regarding the scope of environmental impact documents, attending public hearings, offering comments, or signing up for email notifications related to a particular case.​


​​​​​
< Highlighted Cases