Final Decision Issued
On April 13, 2022 the Commission issued a final decision for this project. At the time of final decision the anticipated start date of construction was
May 2022 with completion by December 2022.
Quarterly construction updates and post decision correspondence between the Commission and the Applicant can be found in the corresponding docket reports.
Docket Reports: 137-CE-195
Towns of Brigham, Mosel, and Sheboygan, and village of Howards Grove all in Sheboygan County
Docket ID: 137-CE-195
Application of American Transmission Company LLC, as an Electric Public Utility, for a Certificate of Public Convenience and Necessity to Construct a New 138 kV Transmission Line from the Howards Grove Substation to the Erdman Substation located in Sheboygan County, Wisconsin.
View and Download Project Map
Jump to Section:
Interactive Map
Use the interactive map to explore the project.
Tips for using the map
- Enter a location or address in
Find address or place to zoom into specific location.
- Click the information button () under the search bar to view additional guidance and tips for using this mapping application.
Application Summary
On April 14, 2021, American Transmission Company, LLC (ATC or applicant), filed an application with the Public Service Commission of Wisconsin (PSC or Commission), to receive a Certificate of Public Convenience and Necessity (CPCN) for the authority to construct a new, single-circuit 138 Kilovolt (kV) transmission line from the Howard Grove Substation in the town of Herman to the Erdman Substation in the town of Sheboygan. The project would also include modifications at the Howards Grove, Erdman, Forest Junction and Lodestar substations.
Applicant stated need: The applicant states that the Sheboygan area possesses unique characteristics contributing to the need for increased transmission facilities due to a large point load that is generally on 24 hours a day, seven days a week. Additionally, there are only two 345 kV circuits and one 138 kV circuit feeding the area. For approximately seven miles, the two 345 kV circuits share common towers, resulting in the potential of a single point of failure for both 345 kV lines. Finally, the only significant generation in the area (Edgewater Generating Station) is scheduled to be retired in 2022.
Estimated cost: ATC estimates that the project would cost $25,606,000 for the Preferred Route and $31,701,000 for the Alternate Route.
Project Location: The proposed project consists of a new 138 kV transmission line from the Howards Grove Substation to the Erdman Substation, and would route through the towns of Brigham, Mosel, and Sheboygan, and the village of Howards Grove all in Sheboygan County.
Proposed schedule:
- If the project is approved, construction is scheduled to begin in May of 2022 and complete in December of 2022.
Statutory Review
The Project is categorized as a
Type II action under
Wis. Admin. Code § PSC 4.10(2). The Commission will prepare an Environmental Assessment (EA) for this project that will evaluate the location of the project and its potential environmental, community, and private property impacts. There will be a preliminary determination when the EA is complete that will determine whether the preparation of an Environmental Impact Statement (EIS) is necessary.
Key Application Documents
Access Docket 137-CE-195 in the PSC Case Management System to view additional information.
Utilize the
Staff Involved tab for contact details for PSC staff assigned to the docket, including the case coordinator and the environmental review coordinator.
Click the
Documents tab for a complete list of docket documents categorized by document type.
Access Docket 137-CE-195