PSC Home Contact US State of Wi Portal
PSC Home
PSC Logo
Electricity Natural Gas Telecom Water consumer

Electricity

Natural Gas

Telecom

Water

Consumers

Case Management System :: Docket Information
5-CE-136 (Active)
Joint Application of Dairyland Power Cooperative, Northern States Power Company-Wisconsin, and Wisconsin Public Power, Inc., for Authority to Construct and Place in Service 345 kV Electric Transmission Lines and Electric Substation Facilities for the CapX Twin Cities-Rochester-La Crosse Project, Located in Buffalo, Trempealeau, and La Crosse Counties, Wisconsin)
Docket Summary Documents Events Related Dockets/
Involved Utilities
Staff Involved History Ex Parte Hearing Reports Service List

CapX 2020 - 345kV Transmission line from Alma to La Crosse
 
Applicant(s): DAIRYLAND POWER COOPERATIVE (1515)

NORTHERN STATES POWER COMPANY (WIS) (4220)

WISCONSIN PUBLIC POWER INC (6685)
Project Description:Joint Application of Dairyland Power Cooperative, Northern States Power Company - Wisconsin, and Wisconsin Public Power, Inc., for Authority to Construct and Place in Service 345 kV Electric Transmission Lines and Electric Substation Facilities for the CapX Twin Cities-Rochester-La Crosse Project, Located in Buffalo, Trempealeau, and La Crosse Counties, Wisconsin.
Current Status: Final Order pdf graphic (3652KB)
Note:The Commission is accepting comments through March 9, 2015, for the limited purpose of taking new evidence regarding a proposed realignment of the high voltage transmission line right-of-way through the properties affected by a proposed exchange of lines between the CapX2020 project and the ATC-NSPW Badger Coulee project (PSC Docket 5-CE-142), if Badger Coulee is approved and its Northern Route option is selected.
Case Coordinator: Kenneth Rineer